How long will it take to get my permit after I make an application?
The Building Department has up to 20 business days to review your complete application after all prior approvals (Land Use, Health Department, etc.) are met. Smaller projects like decks and sheds are generally done more quickly.

Show All Answers

1. When is a permit required?
2. My water heater broke on a Friday night, do I need to wait until Monday and get a permit before I have it replaced?
3. Do I need a permit to re-roof my house?
4. Do I need a permit to reside my house?
5. What are the Building Department’s hours?
6. When are inspections performed?
7. Can I request a specific time for inspections?
8. What is the best time to talk to an inspector?
9. What forms will I need for my permit application?
10. Can I use forms from another town?
11. Can I draw the construction drawings myself or do I need an architect?
12. How many copies of the construction drawing do I need to submit with my application?
13. What needs to be on the construction drawings?
14. How long will it take to get my permit after I make an application?
15. Do I need a permit for a shed?
16. Do I need a permit to put up a fence?
17. When is a permit required for a pool?
18. I’m having replacement windows installed, do I need a permit?
19. How are the fees for permits calculated?
20. My neighbor is doing work and I don’t think they have a permit can an inspector come check it out?
21. Do I need a permit to repair or replace my deck?
22. I want to install a back-up generator, where on my property can it be placed?
23. What codes are used in Wall Township?
24. Do I need a permit to re-roof my house?
25. Do I need a permit to reside my house?
26. Do I need a permit for a shed?
27. Do I need a permit to repair or replace my deck?
28. When is a permit required?